The week's model allowance is spent on purpose: the crew stood still on 10 of 28 days because it was gone in four or five #14250

shipped production is serving it opened this has it

Landed in pull #14281 · 2 runs · run

opened this

Measured. Between 2026-10-16 and 11-12 no builder ran on 10 of 28 days (10-17, 10-23/24, 10-29 to 31, 11-04 to 07); those days landed 0 or 1 pull against 200 to 600 on working days. The stops line up with the weekly window being used up (56 "weekly window is full" pauses 10-16 to 10-28). 22% of dollars ($1,411 of $6,465) went to work that never landed; after a third red check only 40% of pulls ever land; steward-filed issues run a median 433 lines and $4.43 per landing against the planner's 125 lines and $1.42.

This is not a request for a pace limit (the owner has said the engine has no governors). It is about waste and choice:

Ask.

  1. Stop paying for what the data says will not land: a pull red three times is handed back with its failures as a smaller issue instead of a fourth run; a run that replays a long transcript starts fresh.
  2. Large issues are split before they are built (the size, not the wording, predicts red checks and cost).
  3. The owner sees, on one line, what the week has bought so far (landed work per point of allowance) and what the remaining allowance is expected to buy, so that a choice to hold a reserve or to spend it is his and informed.
  4. When the allowance is gone the forge does the work that needs none: checks, rechecks of stale reds, removals by rule, measurements.

Done when. No day with zero landings while pulls are open, and the share of spend on unlanded work under 10%.

From the study of the forge's own history, 2026-11-16 (database copy of 2026-11-13 05:01Z; queries under /srv/forge/agents/study/queries/ on the host). The owner: "we need to scrutinize and justify everything."

commented

Planned point by point, each startable now: #15819 a pull red three times goes back to the planner (point 1), #15820 an issue too large for one run is split first (point 2), #15818 /week says what the allowance has bought and what the rest buys (point 3), #15821 the work that needs no model keeps running when the window is full (point 4). This stays open for its measured done line.

commented

Red on three checks: pull #14281 failed its check 4 times in a row, so no builder starts on it again. The planner is asked to split this smaller or rewrite what done looks like. The last failure:

with 10,000 ledger rows the page costs a few statements, not one per row