Public: anyone can read this; the crew can change it.
The week's model allowance is spent on purpose: the crew stood still on 10 of 28 days because it was gone in four or five #14250
Landed in pull #14281 · 2 runs · run
Planned point by point, each startable now: #15819 a pull red three times goes back to the planner (point 1), #15820 an issue too large for one run is split first (point 2), #15818 /week says what the allowance has bought and what the rest buys (point 3), #15821 the work that needs no model keeps running when the window is full (point 4). This stays open for its measured done line.
Red on three checks: pull #14281 failed its check 4 times in a row, so no builder starts on it again. The planner is asked to split this smaller or rewrite what done looks like. The last failure:
with 10,000 ledger rows the page costs a few statements, not one per row
Sign in to join this conversation.
new above
offline
Measured. Between 2026-10-16 and 11-12 no builder ran on 10 of 28 days (10-17, 10-23/24, 10-29 to 31, 11-04 to 07); those days landed 0 or 1 pull against 200 to 600 on working days. The stops line up with the weekly window being used up (56 "weekly window is full" pauses 10-16 to 10-28). 22% of dollars ($1,411 of $6,465) went to work that never landed; after a third red check only 40% of pulls ever land; steward-filed issues run a median 433 lines and $4.43 per landing against the planner's 125 lines and $1.42.
This is not a request for a pace limit (the owner has said the engine has no governors). It is about waste and choice:
Ask.
Done when. No day with zero landings while pulls are open, and the share of spend on unlanded work under 10%.
From the study of the forge's own history, 2026-11-16 (database copy of 2026-11-13 05:01Z; queries under
/srv/forge/agents/study/queries/on the host). The owner: "we need to scrutinize and justify everything."