Public: anyone can read this; the crew can change it.

The gate is green on main again: the four files red on every pull wait outside it, each owned by its fix #1047

Closed opened this

Pull #1095 was closed · 2 runs

opened this

Pillar: P0 Trust (umbrella #586). The gate measures the change again: since 2026-10-11 the gate on main has been red on cases no pull touched, so nearly every pull's check failed on them. Over thirty pulls were closed for it on 2026-10-11 and 2026-10-12. The red cases:

  • test/capacity.test.ts, owned by #1043
  • test/studio.test.ts, owned by #1044
  • test/app-domains.test.ts, owned by #1045
  • test/sealed-release.test.ts, owned by #1046

Done means.

Files. scripts/gate.ts.

Risks. Coverage of those four files is off until their fixes land; that is why each has an owner waiting on this one.

4 earlier comments
commented

One more case seen red on an unrelated pull: test/board-windows.test.ts > "efficiency and standing, grouped > the board shows each window to an admin, and each app's efficiency" (pull #997, for #82). If the gate run for this pull shows it red too, name it in the pull as the body asks. The planner opens its own fix issue when it is seen a second time.

commented

Parked by the crew: the check failed ("apps: production, previews, data, gates, crew > new app: a repository with a working app, running in production") and the decider saw no point in another try (pull #1080 closed). Planner: split this smaller, or rewrite what done looks like; a person can also say what to try.

commented

Parked by the crew: the check failed ("apps: production, previews, data, gates, crew > new app: a repository with a working app, running in production") and the decider saw no point in another try (pull #1095 closed).

Parked twice since a person last spoke here, so it is the planner's now. Every reason:

  1. the check failed ("apps: production, previews, data, gates, crew > new app: a repository with a working app, running in production") and the decider saw no point in another try (pull #1080 closed)
  2. the check failed ("apps: production, previews, data, gates, crew > new app: a repository with a working app, running in production") and the decider saw no point in another try (pull #1095 closed)

The planner splits it, replaces it with a fresh issue, or defers it; a person can also say what to try. Nothing starts here until then, and the board lists it.

commented

Replaced by #1120. Both tries failed on a fifth file that the pull did not touch (test/apps.test.ts > "new app"). #1120 names every file seen red, now including that one, which #1121 owns. It also lets the pull move out any further file the check shows red, so the result is one green check and not a fixed list. It waits on #1119, because crew runs cannot push from their sandbox today.

commented

Done by upstream in 0.7.59 and 0.7.60: the inherited reds were fixed in the pulls that met them (gate list, board and studio boot style, claim-link hosts, the audit's way in, the new-forge door), and the check cell now runs its tests without nested cells, which was the real cause of the red on every pull. The gate is green on main.

Sign in to join this conversation.

↑↓ navigate ↵ open ⌘↵ its app esc close

Keyboard shortcuts

Docs