Public: anyone can read this; the crew can change it.
A contingency the buyer waives is marked Waived, not done or removed, so its reminders stop and the record shows it was given up on purpose #99
Check · Review · Land · Live done — Landed and live in production.
An open date other than Closing can now be waived. It stays on the deal as Waived, counts as settled, and stops drafting reminders. bun test passes (324 tests) and the design lint passes.
shipped production is serving it deploy d2eada7
An open date other than Closing can now be waived. It stays on the deal as Waived, counts as settled, and stops drafting reminders. bun test passes (324 tests) and the design lint passes. I could not run bun x tsc --noEmit: the repo has no TypeScript installed or tsconfig.json, and bun x tsc fetches an unrelated package. The repo has no scripts/gate.ts or scripts/fast.ts, and scripts/design-lint.ts is actually scripts/lint-design.ts, which is the one I ran.
What changed
- Storage: a migration adds
waived_atandwaived_bytodeadline. A waived date keepsdone_atnull, so "done" still means it happened. - What counts as open:
isOpen,isSettledandisWaivableinsrc/deadlines.tsnow decide this everywheredone_at === nullused to. That covers reminders and the overdue follow-up, the review count, the business-day flag, after-closing conflicts, this week, People, the calendar files, amend and the terminal list. Progress counts a waived date in "N of M dates done". - The action:
waiveDateinsrc/deals.tsaskspermitfor deal update, like Mark done, and is audited asdate.waive, shown on Activity as "waived a date". It refuses Closing, a date already done and a date already waived. Mark done on a waived date says to un-waive first. - Page: the sheet shows Waive…, which asks once (the removal confirm component, with its own button words), and shows Un-waive on a waived date. The marker and badge are grey with the word Waived and no strikethrough; the clock legend and the client timeline read "Waived". The status update lists a waived date under Done as "(waived)".
- Doors:
- POST and DELETE /api/deals/:id/deadlines/:deadline/waive, with the OpenAPI document regenerated.
- The waive_date MCP tool.
- W in the terminal; u un-waives.
- POST /deadlines/:id/waive for the page forms.
- Sample and docs: Juniper Court's appraisal is waived in the sample, and sample refresh and untouched-detection know about it. The README walk-through gets one sentence under step 7;
docs/TECHNICAL.mdhas the details. - Tests:
src/waive.test.tsis new. It covers waiving stopping reminders and the follow-up, un-waiving bringing them back, progress and the timeline, refusing someone who may not update the deal (checked as anon, since any signed-in user can update a deal), and the page, API, MCP and Activity agreeing. A few existing test fixtures gainedwaived_at: null.
To look at
- Door change:
doorOfinsrc/security.tsonly matched/api/deals/:id/x/:y. I widened it by one optional/waivesegment so the issue's path is treated as a deal update. Nocontract.jsoncell changed, and nothing is loosened. - Terminal key:
walready switches to the week view, so waive isW. - Not done: no new role or cell, and I left a done date un-waivable rather than converting it.
Try it: open 2210 Juniper Court and tap the grey Appraisal marker to see Waived and Un-waive. On any deal, open Inspection, tap Waive…, then "Yes, waive".
Waiving is done with the same pattern as Mark done. The shared isOpen/isSettled helpers replace the done_at checks in reminders, conflicts, flags, ICS, people, amend, progress and the terminal. Every door asks permit for deal update, and doorOf was widened by one /waive segment without loosening any contract cell. The new routes are in the OpenAPI document, and there is an MCP tool and a W key in the terminal, plus a migration and an Activity word. Juniper Court's sample appraisal is waived and the README mentions it in one sentence. I read the diff but could not see the cut-off tail of src/waive.test.ts, and the preview's signed-out front page did not show the sample deals, so I did not see the grey Waived marker live.
An open date other than Closing can now be waived. It stays on the deal as Waived, counts as settled, and stops drafting reminders.
bun testpasses (324 tests) and the design lint passes. I could not runbun x tsc --noEmit: the repo has no TypeScript installed ortsconfig.json, andbun x tscfetches an unrelated package. The repo has noscripts/gate.tsorscripts/fast.ts, andscripts/design-lint.tsis actuallyscripts/lint-design.ts, which is the one I ran.What changed
waived_atandwaived_bytodeadline. A waived date keepsdone_atnull, so "done" still means it happened.isOpen,isSettledandisWaivableinsrc/deadlines.tsnow decide this everywheredone_at === nullused to. That covers reminders and the overdue follow-up, the review count, the business-day flag, after-closing conflicts, this week, People, the calendar files, amend and the terminal list. Progress counts a waived date in "N of M dates done".waiveDateinsrc/deals.tsaskspermitfor deal update, like Mark done, and is audited asdate.waive, shown on Activity as "waived a date". It refuses Closing, a date already done and a date already waived. Mark done on a waived date says to un-waive first.-
POSTandDELETE /api/deals/:id/deadlines/:deadline/waive, with the OpenAPI document regenerated. - Thewaive_dateMCP tool. -Win the terminal;uun-waives. -POST /deadlines/:id/waivefor the page forms.docs/TECHNICAL.mdhas the details.src/waive.test.tsis new. It covers waiving stopping reminders and the follow-up, un-waiving bringing them back, progress and the timeline, refusing someone who may not update the deal (checked as anon, since any signed-in user can update a deal), and the page, API, MCP and Activity agreeing. A few existing test fixtures gainedwaived_at: null.To look at
doorOfinsrc/security.tsonly matched/api/deals/:id/x/:y. I widened it by one optional/waivesegment so the issue's path is treated as a deal update. Nocontract.jsoncell changed, and nothing is loosened.walready switches to the week view, so waive isW.Try it: open 2210 Juniper Court and tap the grey Appraisal marker to see Waived and Un-waive. On any deal, open Inspection, tap Waive…, then "Yes, waive".
Closes #96