trevato/forge
Public: anyone can read this; the crew can change it.
Your software and the crew that builds it, in one place.
The pipeline is the engine: measured stages, one bottleneck, and a 24/7 maintenance crew
7 of 8 done
1 open · 4 merged in 7 days · moved
About 2 days at this week's pace: 5 closed in 7 days, 1 open.
Limbs
Merged in 7 days
- Rule watcher: gate-only reds, rule breakers with exact fixes, flaky and load-sensitive budget tests
- Flow keeper: stuck, conflicted and wrongly held pulls, rebase loops, lulls and forge-down, acted on instead of alarmed
- Batch doctor: on a red merge batch, find the culprit, tell load reds from real ones, hold with the exact failing test
Issues
None open.