Public: anyone can read this; the crew can change it.
Land tdobbertin-espo's 6 pulls from the Forgejo mirror onto trunk #8938
Parked by the crew: the run ended without a pull: declined: I can't fetch the six branches. The sandbox blocks git.open-platform.sh (the connection is refused with a 403 on CONNECT, "user denied"), so tdobbertin-espo/forge is unreachable. I also checked `o
Parked by the crew: the run ended without a pull: declined: I can't fetch the six branches. The sandbox denies outbound connections to git.open-platform.sh. git ls-remote https://git.open-platform.sh/tdobbertin-espo/forge fails with a 403 on CONNECT ("user
Parked twice since a person last spoke here, so it is the planner's now. Every reason:
- the run ended without a pull: declined: I can't fetch the six branches. The sandbox blocks
git.open-platform.sh(the connection is refused with a 403 on CONNECT, "user denied"), sotdobbertin-espo/forgeis unreachable. I also checked `o - the run ended without a pull: declined: I can't fetch the six branches. The sandbox denies outbound connections to
git.open-platform.sh.git ls-remote https://git.open-platform.sh/tdobbertin-espo/forgefails with a 403 on CONNECT ("user
The planner splits it, replaces it with a fresh issue, or defers it; a person can also say what to try. Nothing starts here until then, and the board lists it.
Sent back, Mason: the sandbox blocks git.open-platform.sh, so I pushed the six branches here as incoming/espo-68 to incoming/espo-73 (68 shards headers, 69 connect flow, 70 token scope words, 71 origin guard, 72 propose via fork, 73 allow mirrors). Start from those, in the order in this issue. Commits keep their author. Leave a note on the mirror PR only if you can reach it; otherwise say so on the pull and I will.
Deferred, parked twice for the same reason: no builder's sandbox can reach git.open-platform.sh, so the six branches on tdobbertin-espo/forge can't be fetched. A person can unblock it by bringing that repository into the forge (for example through /migrate, or by pushing the six branches to a fork here). Once the branches are reachable from the forge, lift this from the Later gate and it starts as written. Until then it waits behind the Later gate.
Reviewed pull #8979 at its head: ticked Each lands on trunk in that order, keeping the author and intent, one pull each, with the code they touch re-read since it may have moved. If main already does it, say so and close it with the link.; Nothing weakens the origin guards or token handling; these touch both, so a reviewer reads them against what's on main now.. left open: Each Forgejo PR gets a note with the trunk pull and is closed once landed. — The builder could not reach the Forgejo host; a person must post the notes and close the six PRs..
Left open after pull #8979 landed: 1 unticked item remains (Each Forgejo PR gets a note with the trunk pull and is closed once landed.). The planner files each as its own issue and closes this one; a person may close it, tick what is done, or say what is left. Until then the crew does not pick it again.
Trusted by the owner. Open on git.open-platform.sh/trevato-apps/forge since 2026-10-23, and 1,581 commits behind trevato/forge main. Conflicts measured in a trial merge 2026-11-02: #68 shards Actions headers (0), #69 connect flow stored target (1), #73 origin allow mirrors (1), #70 token scope words (3), #71 origin guard (7), #72 propose via fork (8). Fetch from
tdobbertin-espo/forge; branchesfix/shards-actions-headers,fix/connect-flow-stored-target,fix/origin-allow-mirrors,fix/token-scope-words,feat/origin-guard,feat/propose-via-fork.Done when: