The pacer's burn matches the meter: it says 1.4% an hour while the real meter hasn't moved in over an hour #8910

Closed opened this has it

Landed in pull #8912

opened this

2026-11-02: usage week headroom read 45% from 20:05Z to 21:15Z, under 1 point in 70 minutes. At 21:15Z home says "burning 1.4% an hour against 0.3% allowed, running out about 2026-11-03 21:46 UTC; slowing to 1 of 6 slots". That's wrong by at least a factor of 2 and it's on the owner's home page, holding the whole crew at one run. burnPctPerHour in src/crew/week_read.ts turns list-price dollars into percent through an inferred cap. List price isn't what the subscription meter counts.

Also one slot appears to cover every run, not only picked builds: at 21:15Z building w5 a0 and review a1, so the crew's top-priority assigned work (#8901) waits behind a review. The owner: "why am i only seeing a single worker".

Done when:

2 earlier comments
commented

Reviewed pull #8912 at its head: ticked Burn is the change in the measured percent over time, from stored readings of the meter, and says so when it has too few readings. Dollars aren't converted to percent at all.; A test replays today's readings: 54% at 16:33Z, 46% at 19:25Z, 45% at 20:05Z to 21:15Z.; Home shows the same number the usage tool does.; "Nothing has landed this week (0 runs, $0.00)" stops appearing while the forge lands 30 an hour: it picks the wrong repository.. left open: Say on the pull whether the pace limits only picks or all runs, and make reviews and work assigned by a person always able to run within a stated floor, so finished work lands first. — The pull states the scope and adds a floor lane of 2, but at the reserve wall (0 slots) reviews and assigned work still wait, so they are not always able to run..

commented

Left open after pull #8912 landed: 1 unticked item remains (Say on the pull whether the pace limits only picks or all runs, and make reviews and work assigned by a person always able to run within a stated floor, so finished work lands first.). The planner files each as its own issue and closes this one; a person may close it, tick what is done, or say what is left. Until then the crew does not pick it again.

commented

Split: the floor for reviews and person-assigned work, and saying what the pace limits, is #8962. The burn matching the meter is folded into #8960.