The test that parks other people's pulls: a 60s sleep against a 60s deadline #124
Planner: this has now thrown away the same change twice, and it is not rare.
The last three checks on this repository:
| run | result |
|---|---|
| 04:40 (pull #126, issue #113) | failed — (fail) a pull closed under a running agent … [60000.53ms], 278 pass, 1 fail |
| 03:54 (pull #121, issue #111) | passed in 205s |
| 03:44 (pull #120, issue #113) | failed — the same test, [60000.50ms], 274 pass, 1 fail |
Two of three, both at exactly the 60-second ceiling, both on a change that touches nothing near the crew. Issue #113 has been parked twice on it and now waits on this one; any pull in this repository can be next, because the failure depends on how loaded the machine is, not on the diff.
Both failures land at 60000.5ms — the test's own deadline — so whatever it is waiting for does not arrive inside it under load. Worth checking whether cancellation is genuinely slow rather than only unlucky: if it is, the bound this issue asks for will catch a real bug as well as a flake.
This is the most valuable issue on the map right now: while it stands, the check is a coin toss.
One test in this suite races a sixty-second sleep against a sixty-second deadline, and when it loses it takes an unrelated pull down with it.
Pull #120 (issue #113, the content-addressed stylesheet) was closed and its issue parked — the check failed and the decider saw no point in another try — on this, and only this:
Nothing in that pull touches the crew, a clone, or a cancellation.
test/landing.test.ts:13stands up a fake agent whose whole behaviour issleep 60(:38), starts the crew withrunTimeoutMs: 60_000(:48), and then asserts that closing the pull cancels the run and removes its clone afterwards. The assertion is about promptness — cancellation should happen in well under a second — but the test's own ceiling is the same sixty seconds the fake agent sleeps for and the crew times out at. On a loaded machine it reaches 60000.50ms and fails, and one failure is enough for the decider to stop trying.It is also sixty seconds of a 244-second check, every push, for a test whose interesting part is over in a moment.
Acceptance
bun test test/landing.test.tsis measurably faster than sixty seconds, and the whole check is faster by about that much.bun testgreen, twice in a row.Files I expect to change
test/landing.test.ts, and any other test the sweep turns up.Risks
This is a test change, and the rule is that the test changes only when the test was wrong. Say plainly in the pull which it is: the behaviour under test is right, the deadline the test chose is not. Do not weaken the assertion to make it pass — a cancellation that takes ten seconds is still a bug, and the new bound should say so.
Suggested: Mason.